This project was a proto type iron ore processing plant project. The HSE systems were a mixture of innovation and historic applications. With a workforce in excess of 3,500 individuals from as diverse multicultural backgrounds as China, the Philippines, Australia , South Africa, Ireland,Poland and other nations all participating in high hazard activities.the HSEMS was able to apply its benefits equally and without discrimination. The project was an extremely good representation of how individuals where-ever their origins can benefit from OH&S and I am proud to be associated with this project outcome.
Sino Iron Ore at Cape Preston Western Australia
Tailings Dam at Parkes NSW
Positive outcomes and achievable goals
RECENT PROJECTS




This project involved extensive liasion and positive communication between the principle contractor and the subcontractor. It involved engineering concepts in quality while at the same time including environmental issues.
It was a pleasure to be an active participant in this project.
The contract called for the subcontractor to have a OH&SMS equal to if not better than Rio Tinto's as Rio Tinto's OH&SMS is of an advanced nature this job was an absolut pleasure to work in
Below are the logos of the contractors involved and some pictures of the project. The project reqired a lot of future detail planning as well as ongoing revision and monitoring as in accordance with ISO 9001 as the project progressed.















